Context

What this building type demands

Above roughly twenty storeys, the facade stops being a cladding package and becomes a programme risk. Every week lost to weather or a slow work front pushes the whole building. That is why towers are almost always unitized: the panels are finished in the factory while the structure rises, then installed at a rate of 60–120 units per shift.

The engineering work happens earlier than most contractors expect. Wind pressure at the corner zones, inter-storey drift under seismic or wind action, thermal movement over a 60 m elevation and the crane pick plan all have to be settled before profiles are extruded — not after the first mock-up fails.

Requirements

The four that decide the specification

Each of these changes the profile, the glass or the fixing — usually all three. We ask for the numbers before quoting.

  1. 01

    Wind load and deflection

    Corner and parapet zones can see design pressures two to three times the field of the facade. Mullion depth, glass thickness and anchor spacing are set from the project wind study, and deflection is held to L/175 or the specification limit.

  2. 02

    Inter-storey drift

    Concrete frames move. The interlock has to keep its gasket engagement at the calculated drift, which usually means a wider engagement than a standard profile gives. We ask for the drift figure rather than assuming a default.

  3. 03

    Installation logistics

    A tower crew is typically four to six people plus a crane or hoist. Units are packed in installation sequence, floor by floor, so the crate opened on Tuesday contains Tuesday’s panels — not the whole elevation.

  4. 04

    Fire, smoke and spandrel zones

    Perimeter fire containment at each slab edge is a life-safety item, not a detail to be resolved on site. Spandrel build-ups include mineral wool, fire-stop mastic and, where required, a rated steel sill.

High-Rise Towers