Curtain wall system
Stick-System Curtain Wall
Loose profiles, assembled on site — economical for mid-rise and complex geometry.
- 120 / 150 / 180 mm depth
- Loose-pack shipping
- On-site tolerance adjustment
Overview
How the system is built
BLTC manufactures and exports this system to facade contractors, developers and importers in North America, the Gulf and Europe. The stick system is assembled on site: mullions are fixed to the slab edge or to steel brackets, transoms are cut in, and glazing follows bay by bay. Because the profiles ship loose and nested, freight volume is roughly a third of an equivalent unitized package — a real advantage on mid-rise buildings and on projects with unusual geometry.
It is also the more forgiving system when the structure is out of tolerance or when drawings are still moving during the build. Adjustments happen on site rather than in the factory, which suits projects with a competent local installer and a realistic weather window.
Specifications
Stick-System Curtain Wall data
Ranges we manufacture to. Project values are fixed by calculation and confirmed on the approved shop drawings.
| Material | AA6063-T5 extrusions, mill or PVDF finish; steel reinforcement where required |
|---|---|
| System depth | 120 mm, 150 mm or 180 mm face-to-back |
| Surface finish | PVDF 70% KYNAR 500, 25–35 µm; anodized 15–25 µm; powder coat |
| Glazing | IGU 6+12A+6, laminated 6.38–13.52 mm, single glazed where specified |
| Maximum panel size | 1,500 × 3,600 mm; larger bays subject to structural review |
| Fire rating | B-s1,d0 to EN 13501-1; fire-rated spandrel options |
| Air and water | EN 12152 Class AE; EN 12154 Class RE 1200 |
| Wind load | Design to 4.0 kPa, tested to 6.0 kPa |
| Thermal performance | Ucw 1.4–2.4 W/m²K depending on glazing |
| Design life | 25 years; 20-year coating warranty available |
Indicative values for preliminary sizing. Site-assembled systems are sensitive to installer quality; we supply setting-out drawings and a site supervisor on request.
System details
Joints, movement and anchorage
The four details that decide whether the facade performs for twenty-five years. Project-specific drawings are issued for approval before production.
01
Mullion and transom connection
Mullions are continuous over two or three floors with expansion joints at the brackets; transoms are mortised and fixed with stainless steel cleats. The connection is designed so that a transom can be replaced without removing the mullion.
02
Wet-seal versus dry-glaze
Dry-glaze with EPDM gaskets is standard and needs no site sealant on the face. Wet-seal is available where the design calls for a flush silicone joint, but it moves the critical work into site labour and weather protection — we will say so if the detail does not need it.
03
Drainage path
Each bay drains through weep slots in the transom to the outside face, with a continuous air seal behind. Internal baffles keep the pressure equalised so wind-driven rain does not migrate past the first gasket.
04
Site support
Packages include setting-out drawings, a fixing sequence, torque values and a QA checklist. For first-time installers we can send a supervisor for the first two floors, or run a factory trial assembly with your crew.
Finishes
PVDF or anodized?
Both are factory-applied and both last decades. The choice is usually decided by colour range and by what the specification in your market recognises.
| Property | PVDF (70% KYNAR 500) | Anodized |
|---|---|---|
| Film build | 25–35 µm, 2- or 3-coat system | 15–25 µm, integral anodic layer |
| Colour range | Full RAL / NCS range, metallics, mica, wood-grain | Natural silver, champagne, bronze, black (limited) |
| Weathering | AAMA 2605 / EN 12206, 10-year Florida exposure | Excellent — the surface is not a coating |
| Colour stability | ΔE ≤ 5 after 10 years, standard colours | No coating to fade; colour is in the metal |
| Impact / abrasion | Good; touch-up possible on site | Very good; scratches are difficult to repair |
| Best suited to | Facades, panels, coastal and high-UV exposure | Interiors, entrance frames, exposed metallic look |
| Warranty | 20–30 years, project-specific | 10–15 years |
Powder coating is available as a third option for interior and low-exposure applications. For coastal projects we default to a 3-coat PVDF build at 35 µm minimum.
Downloads
Documents for your submission
Files are released per project so that the correct profile family and revision reaches your consultant. Request the set and we will send it with the quotation.
Where it is used
Typical applications
FAQ
Questions about this system
If your question is about a specific elevation, send it with the drawing — the answer is usually in the geometry.
When is a stick system the better commercial choice?
Can stick and unitized systems be combined?
How do you protect the aluminium in coastal projects?
Stick-System Curtain Wall
Send the elevation — we will price the package
Include the building height, the wind region and the glazing specification if you have it. We reply with a preliminary panel schedule, the applicable test reports and a quotation.